Lines Matching full:utilization

183       the task's utilization must be removed from the previous runqueue's active
184 utilization and must be added to the new runqueue's active utilization.
192 its utilization is removed from the runqueue's active utilization.
195 its utilization is added to the active utilization of the runqueue where
219 - Umax is the maximum reclaimable utilization (subjected to RT throttling
221 - Uinact is the (per runqueue) inactive utilization, computed as
223 - Uextra is the (per runqueue) extra reclaimable utilization
343 The utilization of a real-time task is defined as the ratio between its
347 If the total utilization U=sum(WCET_i/P_i) is larger than M (with M equal
350 Note that total utilization is defined as the sum of the utilizations
354 Moreover, if the total utilization is larger than M, then we risk starving
356 If, instead, the total utilization is smaller than M, then non real-time
369 utilization[12].
378 of all the tasks executing on a CPU if and only if the total utilization
400 but this cannot be done by comparing the total utilization or density with
434 time t + e + P, after its absolute deadline. The total utilization of the
443 between total utilization (or density) and a fixed constant. If all tasks
455 As seen, enforcing that the total utilization is smaller than M does not
458 a total utilization smaller than M is enough to guarantee that non real-time
463 the total utilization is smaller or equal than M then the response times of
562 correctly schedule a set of real-time tasks is that the total utilization
565 than M. Notice that the ratio runtime/period is equivalent to the utilization
586 interface we can put a cap on total utilization of -deadline tasks (i.e.,